Skip to content
Service

Bathrooms.

Add one where there is none, refresh the one you have, or gut it back to the studs. Here is what separates them.

  • Free walkthrough
  • Written estimate, usually in 48 hours
  • Photos as we go

The three types.

New 3/4 bath, beforeNew 3/4 bath, after
BeforeAfter

A basement with no bathroom, finished as a full 3/4

Option 01

New 3/4 bath

Toilet, sink and shower put into a space that never had one. Framed out, then finished from bare walls.

Tub or shower
Shower
Tile work
Floor and shower walls
Typical downtime
Three to four weeks
Best when
Adding a bathroom where there was not one
  • Space framed out from bare walls
  • Shower, toilet and sink installed
  • Floor laid and sealed
  • Finish carpentry, trim and door
  • Paint, patching and daily cleanup
Full bath refresh, beforeFull bath refresh, after
BeforeAfter

Same tub, everything around it new

Option 02

Full bath refresh

New vanity, floor, lighting and fittings, keeping the existing tub or shower in place.

Tub or shower
Existing stays
Tile work
Floor and patches
Typical downtime
One to two weeks
Best when
Fittings are dated, the layout is fine
  • Vanity, floor and lighting replaced
  • Existing tub kept and made good
  • Fittings and hardware swapped
  • Paint and trim
  • Final clean before sign off
Full gut, beforeFull gut, after
BeforeAfter

Old surround out, new tile from the tub up

Option 03

Full gut

Everything out, including the surround. The moment to change the layout or convert to a walk in.

Tub or shower
All new
Tile work
Floor and full surround
Typical downtime
Four weeks or more
Best when
Everything goes, including the surround
  • Everything out, down to the studs
  • Waterproofing behind new tile
  • Full tile surround and floor
  • Walk in conversion where you want one
  • Final clean before sign off
Scope

What the quote covers.

The commonest reason a quote comes in higher than expected is that the first one left something out. Ours does not.

In every bathroom

  • Demolition and haul away
  • Vanity, fittings and hardware installation
  • Tile floor and surround, including setting materials
  • Waterproofing behind tile
  • Finish carpentry, trim and paint
  • Daily cleanup and a final clean

Quoted separately

  • Tile, vanity and fittings themselves, you choose them
  • Anything hidden found behind the old surround
  • Structural repair if the subfloor is soft
  • Permit fees where the city requires them
Variables

What moves the number.

01

Does the surround come out

Keeping the tub or shower in place is the biggest single saving.

02

Tile area and pattern

Floor only is quick. A full height surround with a pattern is not.

03

Subfloor condition

Bathrooms are where old leaks show up. Soft subfloor gets repaired first.

04

Walk in conversion

Changing a tub to a walk in is a bigger job than swapping fittings.

05

Room size

A powder room and a primary bath are different jobs.

06

Fittings you pick

Largely in your hands, and quoted as its own line.

Gallery

Recent bathrooms.

Bathrooms project photo 1Bathrooms project photo 2Bathrooms project photo 3Bathrooms project photo 4Bathrooms project photo 5Bathrooms project photo 6Bathrooms project photo 7Bathrooms project photo 8
FAQ

Bathrooms questions.

Can you convert a tub to a walk in shower?
Yes, and it is one of the most requested senior safety changes. It is a full gut of that wall, so it is quoted as such.
How long without a bathroom?
A refresh is one to two weeks. A full gut is four weeks or more. If it is your only bathroom, tell us and we will sequence it to keep it usable as long as possible.
Do I pick the tile?
Yes. You choose it, we install it. The quote covers setting materials, not the tile.
What if there is water damage behind the tile?
Work stops, you get a written change order with a price, and you approve it before we continue.

We use cookies and analytics to improve the site. Strictly necessary cookies are always on; analytics and marketing are off until you opt in. See our Cookie Notice.