Skip to content
Service

Kitchens.

Three levels, from a look-only refresh to moving the layout. Here is what separates them and what changes the number.

  • Free walkthrough
  • Written estimate, usually in 48 hours
  • Photos as we go

The three levels.

Refresh, beforeRefresh, after
BeforeAfter

Same layout, brought back to new

Option 01

Refresh

Same layout, new look. Paint or reface cabinets, new counters, new flooring, new hardware and lighting.

Layout moves
No
Cabinets
Painted or refaced
Typical downtime
One to two weeks
Best when
The layout works, the finishes are tired
  • Cabinets painted or refaced
  • New counters fitted
  • New floor laid
  • Hardware and lighting swapped
  • Paint, patching and daily cleanup
Partial, beforePartial, after
BeforeAfter

Everything new, same footprint

Option 02

Partial

Same footprint, new everything. Cabinets out, counters out, floor out, then back in fresh.

Layout moves
No
Cabinets
All new
Typical downtime
Three to four weeks
Best when
You want everything new in the same footprint
  • Old kitchen stripped and hauled away
  • New cabinets and counters installed
  • New floor and backsplash
  • Finish carpentry, trim and toe kick
  • Paint, patching and daily cleanup
Full gut, beforeFull gut, after
BeforeAfter

Back to the studs, then rebuilt

Option 03

Full gut

The layout moves. Walls, islands and openings change so the room finally works the way you use it.

Layout moves
Yes
Cabinets
All new
Typical downtime
Five weeks or more
Best when
The room does not work the way you use it
  • Walls and openings altered where structure allows
  • Island or peninsula built in
  • Full new cabinets, counters and floor
  • All finish carpentry
  • Paint, patching and daily cleanup
Scope

What the quote covers.

The commonest reason a quote comes in higher than expected is that the first one left something out. Ours does not.

In every kitchen

  • Demolition and haul away
  • Cabinet and counter installation
  • Flooring, including subfloor prep
  • Backsplash and tile work
  • Finish carpentry, trim and toe kick
  • Paint, patching and daily cleanup

Quoted separately

  • Cabinets and counters themselves, you choose them
  • Appliances
  • Structural work if a wall is load bearing
  • Anything hidden behind the old cabinets
  • Permit fees where the city requires them
Variables

What moves the number.

01

Which level

A refresh and a full gut are different jobs, not different budgets for the same job.

02

Does the layout move

Keeping the footprint is the single biggest saving available to you.

03

Cabinet choice

You pick them, so this line is largely in your hands.

04

What is behind them

Older homes hide old repairs behind cabinet runs. We look before we quote.

05

Counter material

Fabrication and template time varies a lot by material.

06

Room size

More run means more cabinets, more counter and more floor.

Gallery

Recent kitchens.

Kitchens project photo 1Kitchens project photo 2Kitchens project photo 3Kitchens project photo 4Kitchens project photo 5Kitchens project photo 6Kitchens project photo 7Kitchens project photo 8
FAQ

Kitchens questions.

How long is a kitchen out of use?
A refresh is one to two weeks. A partial runs three to four, and a full gut five or more. We give you the real number at the walkthrough, and we set up a temporary spot for a microwave and a kettle.
Do I pick the cabinets and counters?
Yes. You choose them and we install them, which keeps you in control of the look and the budget.
Can you move a wall?
Often, yes. It depends on whether the wall is carrying load, which we find out at the walkthrough before anything is promised.
Will I need a permit?
It depends on your city and how much changes. Permit fees are listed separately so nothing is buried.

We use cookies and analytics to improve the site. Strictly necessary cookies are always on; analytics and marketing are off until you opt in. See our Cookie Notice.