Skip to content
Service

Flooring.

Vinyl and laminate, tile, or carpet. Here is how they compare, what the install includes, and what changes the number.

  • Free walkthrough
  • Written estimate, usually in 48 hours
  • Photos as we go

The three options.

Vinyl and laminate, beforeVinyl and laminate, after
BeforeAfter

Old floor out, new plank laid wall to wall

Option 01

Vinyl and laminate

The practical pick. Waterproof, hard wearing and friendly on budget. Good for kitchens, basements, entryways and anywhere with pets or kids.

Lifespan
10 to 25 years
Wet areas
Yes, waterproof
Subfloor prep
Included
Best for
Kitchens, basements, busy homes
  • Old floor lifted and hauled away
  • Subfloor checked and levelled where needed
  • Underlayment and transition strips
  • Baseboard off and back on
  • Final clean before sign off
Tile, beforeTile, after
BeforeAfter

Tile set at the doorway, then carpet up to it

Option 02

Tile

The longest lasting of the three and the only one we recommend for a full bathroom floor. The quote covers setting materials, not the tile itself.

Lifespan
40 years and up
Wet areas
Yes, best choice
Subfloor prep
Included, cement board and mortar
Best for
Bathrooms, entryways, mudrooms
  • Cement board and mortar included
  • Layout set out before anything is fixed
  • Cuts made to the opening
  • Grout and seal finished
  • Final clean before sign off
Carpet, beforeCarpet, after
BeforeAfter

Old checkerboard floor out, carpet wall to wall

Option 03

Carpet

Warm underfoot and the quietest option in the house. The usual pick for bedrooms, stairs and family rooms.

Lifespan
8 to 15 years
Wet areas
Not recommended
Subfloor prep
Included
Best for
Bedrooms, stairs, family rooms
  • Old floor and underlay lifted and hauled away
  • Subfloor checked and made smooth
  • New underlay included
  • Edges, thresholds and stairs finished
  • Final clean before sign off
Scope

What the quote covers.

The commonest reason a quote comes in higher than expected is that the first one left something out. Ours does not.

In every floor

  • Removing and hauling away the old floor
  • Subfloor inspection, and leveling where it is needed
  • Setting materials, including cement board and mortar for tile
  • Underlayment and transition strips between rooms
  • Baseboard and quarter round removal and reinstall
  • Daily cleanup and a final clean before sign off

Quoted separately

  • The tile itself, you pick it and we install it
  • Structural subfloor replacement if we find rot
  • Moving large or built in furniture
  • Appliance disconnect or reconnect
  • New baseboard, if you want to replace rather than reuse
Variables

What moves the number.

01

Square footage

Bigger rooms cost more in total but usually less per square foot, because setup happens once.

02

Subfloor condition

In an older Cleveland home this is the big one. A level, sound subfloor installs fast. A soft one gets repaired first.

03

Layout and cuts

A plain rectangle is quick. Angles, thresholds, stair nosings and tricky patterns all add labor.

04

What is coming out

Floating laminate lifts in an afternoon. Glued down tile over a slab is a much longer day.

05

Stairs

Stairs are quoted per tread, not by the square foot. Slow, detailed work.

06

Room count

Three rooms in one visit costs less each than three separate trips.

Gallery

Recent flooring.

Flooring project photo 1Flooring project photo 2Flooring project photo 3Flooring project photo 4Flooring project photo 5Flooring project photo 6
FAQ

Flooring questions.

Do I buy the flooring, or do you?
Either works. Most people pick the tile or plank they want and we install it, which keeps you in control of the look. If you would rather we source it, we can, and it goes on the estimate as its own line.
Can you put new flooring over the old floor?
Sometimes, and it saves money when it is safe. But it raises the floor height at every doorway and it hides whatever is underneath. We will tell you at the walkthrough.
How long does a room take?
A single average room is usually one to two days once the old floor is out. Tile takes longer because mortar has to cure.
What if you find rot underneath?
Work stops and you get a written change order with a price before we touch it. This is the most common surprise in an older Cleveland home.

We use cookies and analytics to improve the site. Strictly necessary cookies are always on; analytics and marketing are off until you opt in. See our Cookie Notice.